To The Editor:

We would thank all those who have made Warren’s new town pavilion possible. We appreciate all who donated to the Better Places Grant and Vermont’s Department of Housing and Community Development. The Warren Select Board and Planning Commission for putting this project forward and helping to revive this ‘third space’ without cost to share time and space. It was Dayna Lisaius who roped us into this project in the first place. We’d like to thank these folks who donated time and expertise:

Advertisement
  • Kevin Collins Electrical for the lighting of this frame.
  • Abraham Cole Goyett Catamount Crane Company for donating and running his crane.
  • Carol Concrete for donating concrete.
  • Jim Crafts, for sanding, holding, staining, and supporting us.
  • Tucker Sargent for helping cut and raise this frame.
  • Tim Holter and those who cheered us on in the rain, thank you for showing up.
  • Capitol City Steel for the discounts provided.
  • Mountain Air Systems for the holes drilled into the railing plates.
  • Andrew Spencer for allowing us to use his shop rails.
  • Devin Bailey for machine mobilization for the excavation.

We appreciate Alice Cheney’s four-gabled design and the counsel of Jim Sanford and Ellen Strauss for their architectural help. The Warren Road Crew helped haul topsoil during excavation as did Luke Youmell.

Thank you all for your support, your assistance, and your belief in contributing to our communities. We are so grateful for this opportunity and excited to see it be used. It is in your enjoyment that we find satisfaction.

Corrigan and Klein Artisan Builders
Warren